Project Candy — Commercial Fire Restoration
Complete electrical restoration of a multi-level commercial building following significant fire damage — from site assessment through to switchboard upgrade and final fit-off.

Project Candy presented Adamson Electrical with a rewarding and technically involved scope of work — the complete electrical restoration of a multi-level commercial building, formerly operating as a gym, following significant fire damage.
The Challenge
Fire damage at a commercial scale requires more than repairs — it demands a methodical, ground-up approach to ensure the building is safe, compliant, and ready for its next chapter. That's exactly what we delivered.
Our Scope of Work
From the initial site assessment through to final fit-off, Adamson Electrical managed the full electrical restoration including:
- Initial site inspection and detailed planning
- Safe disconnection of all existing electrical services
- Temporary power supply to support the broader restoration works
- Complete strip-out of damaged electrical infrastructure
- Testing and labelling of all cabling from the switchboard
- Full re-run of cables and conduit throughout the building in line with the approved fixture layout and scope
- Fit-off of all nominated electrical fixtures
- Complete switchboard upgrade
Delivered On Time
Coordinating across multiple trades on an insurance-driven project requires clear communication and precise scheduling. Adamson Electrical maintained a seamless workflow throughout, keeping the project on track for both the client and their insurer without compromising on quality or compliance.
